Analisis Kesehatan Mental Jemaat Akibat Pembangunan Gedung Gereja yang Tertunda di Gereja Kemah Injil Indonesia Tondon Makale

Samsor, Risma Meyani (2024) Analisis Kesehatan Mental Jemaat Akibat Pembangunan Gedung Gereja yang Tertunda di Gereja Kemah Injil Indonesia Tondon Makale. Scholar thesis, Institut Agama Kristen Negeri (IAKN) Toraja.

[img] Text
risma_skpp.pdf

Download (82kB)
[img] Text
risma_hd.pdf

Download (312kB)
[img] Text
risma_kp.pdf

Download (549kB)
[img] Text
risma_bab_1.pdf

Download (597kB)
[img] Text
risma_bab_2.pdf

Download (641kB)
[img] Text
risma_bab_3.pdf
Restricted to Repository staff only

Download (500kB) | Request a copy
[img] Text
risma_bab_4.pdf
Restricted to Repository staff only

Download (559kB) | Request a copy
[img] Text
risma_bab_5.pdf

Download (417kB)
[img] Text
risma_dp.pdf

Download (410kB)
[img] Text
risma_lp.pdf

Download (360kB)
[img] Text
risma_cv.pdf

Download (275kB)

Abstract

Risma Meyani Samsor judul penelitian: Analisis Kesehatan Mental Jemaat Akibat Pembangunan Gedung Gereja Yang Tertunda Di GKII Tondon Makale. Penelitian ini berasal dari adanya pembangunan gedung gereja yang tertunda dan akibatnya bagi jemaat di GKII Tondon Makale. Pembangunan yang tertunda merupakan dampak yang dialami oleh jemaat setempat yang merasa cemas dan kecewa. Penelitian ini dilakukan dengan menggunakan metode kualitatif dimana penulis menggunakan teknik pengumpulan data yaitu wawancara dan observasi. Tujuan dari penelitian ini ialah untuk menganalisis kesehatan mental jemaat akibat pembangunan gedung gereja yang tertunda di GKII Tondon Makale. Berdasarkan hasil penelitian, maka penulis menyimpulkan bahwa pembangunan gedung gereja yang tertunda berdampak pada jemaat yang mengalami kendala dalam pengumpulan dana. Dengan temuan penelitian menunjukkan bahwa pembangunan gedung gereja yang tertunda berdampak negatif terhadap kesehatan mental jemaat, dengan perasaan cemas, tidak nyaman, dan kecewa. Risma Meyani Samsor research title: Analysis of Congregation Mental Health Due to Delayed Church Building Construction at GKII Tondon Makale. This research originates from the delayed construction of a church building and its consequences for the congregation at GKII Tondon Makale. Delayed construction is an impact experienced by the local congregation who feel anxious and disappointed. This research was conducted using a qualitative method where the author used data collection techniques, namely interviews and observations. The purpose of this study was to analyze the mental health of the congregation due to the delayed construction of the church building at GKII Tondon Makale. Based on the results of the study, the author concluded that the delayed construction of the church building had an impact on the congregation who experienced obstacles in collecting funds. The findings of the study indicate that the delayed construction of the church building has a negative impact on the mental health of the congregation, with feelings of anxiety, discomfort, and disappointment.

Item Type: Thesis (Scholar)
Subjects: B Philosophy. Psychology. Religion > BF Psychology
B Philosophy. Psychology. Religion > BV Practical Theology
Depositing User: ap sarmita sumule
Date Deposited: 04 Sep 2024 15:17
Last Modified: 04 Sep 2024 15:17
URI: http://digilib-iakntoraja.ac.id/id/eprint/2307

Actions (login required)

View Item View Item